2013

November- Founded
December- Classification 300,000 cleanroom was setup for production

 

 

2014

-March- An inspection warehouse with an area of 30 m2 was set up according to ANSI/AHAM AC-1 standard requirements
-March- A 1 cubic meter size test chamber was set up according to J1467, drafted ‘special material inspection methodology'
-May- air filter inspection station for end products inspection was set up according to EN779 standardsJuly- Completion of our first testing chamber for automotive air filtering testing2016

 

 

2016 

April- Completion of a 30 cubic meter inspection chamber according to GB/T18801:2015/for contamination inspection, completion of second chamber for CCM air filtering performance testing.

 

2018

May- Setting up three station automated production lines, reaching 70% automation rate and increasing efficiency.

 

 

2019

March- Completion of a 81m3 cubic meters inspection cabin according to GB/T 18801 for testing the CADR of solid/gaseous matter pollution of large purifiers.

July-Completion of a Gas pollutant penetration test device according to ANSI/ASHRAE Standard 145.2-2016 for testing the performance and life of gaseous filter materials.